Storm trunk line, laterals, and inlet structures for a phased single-family development.
Reinforced concrete pipe installed from the outfall upstream, tying each phase in as grading was released, inside a tight seasonal window.
What we did
- Storm trunk line
- Laterals and inlets
- Junction boxes
- Outfall tie-in
- Trench protection
- Compaction testing
How we kept it safe
Engineered trench protection, competent-person inspections logged at every entry, and confined-space procedures on structures.
Client
General contractor
County
Montgomery, TX
Pipe
Storm RCP
Phases
Three, sequenced
Status
Active
Delivery
Q1 2027
