Bridge construction for Legacy Drive, Phase 2, featuring drilled shaft foundations, concrete abutments, prestressed concrete girders, a reinforced concrete deck, sidewalks, and approach slabs.
Legacy Bridge is part of the Legacy Drive, Phase 2 paving and bridge project in League City, Texas. The bridge design includes 36-inch drilled shaft foundations, concrete abutments, prestressed concrete girders, and a reinforced concrete deck. Additional features include bridge sidewalks, concrete approach slabs, vehicle and pedestrian rails, expansion joints, and mechanically stabilized earth retaining walls.
- Drilled shaft foundations
- Concrete abutments
- Prestressed concrete girders
- Reinforced concrete bridge deck
- Bridge sidewalks and approach slabs
- Vehicle rails, pedestrian rails, and expansion joints
- Mechanically stabilized earth retaining walls
Safety measures include controlled access around drilling and excavation areas, fall protection for work at exposed bridge edges, and designated exclusion zones during lifting operations. Spotters help coordinate equipment movement, while crews maintain clear access routes and review hazards before each phase of work.
