Roadway and drainage improvements along Chimney Rock Road, from south of American Canal to McHard Road, including concrete paving, two canal bridges, retaining walls, underground storm drainage, and a stormwater pump station.
Chimney Rock Road Segment Two combines roadway construction with drainage and structural improvements in Fort Bend County. The project scope includes concrete pavement, curbs, sidewalks, ADA ramps, and northbound and southbound bridges over American Canal. Underground storm drainage, retaining walls, and a stormwater pump station support the corridor’s drainage system, with traffic signal improvements and pavement markings included in the overall work.
- Site preparation and earthwork
- Concrete paving, curbs, sidewalks, and ADA ramps
- Storm sewer pipes, box culverts, inlets, and manholes
- Retaining walls
- Stormwater pump station and concrete structures
- American Canal bridge foundations and concrete structures
- Erosion control and site restoration
The project specifications include trench safety systems, temporary shoring for pump station excavation, and traffic control using barricades, barriers, cones, and signs to protect work areas and maintain separation from roadway traffic.
