Waterstone Section 4

Fort Bend County, Texas · Site prep

Mass grading, detention basin excavation, and storm drainage for a 218-lot residential section.

Topsoil stripped and stockpiled, the basin cut to grade with machine control, and the site balanced to avoid import. Storm lines and inlets went in ahead of subgrade so paving followed without a gap.

What we did
  • Clearing and grubbing
  • Topsoil strip
  • Detention basin
  • Mass grading
  • Storm sewer and inlets
  • Erosion control
How we kept it safe

Task plans written each shift, excavations inspected before entry, and a flagging plan where haul routes crossed occupied lots.

Client
Residential developer
County
Fort Bend, TX
Earthwork
Balanced on site
Lots served
218
Status
Active
Delivery
Q4 2026